Remake
This is the final remake of my chosen music video. I am very happy with the final result as I think it looks very similar to the origional. I used lots of different effects to layer over the origional film as this helped to add a old and red tinted effect. If i was to improve this video I would take more time and planning on the car scene so that it looks more realistic overall.
Saturday, 15 June 2013
Friday, 14 June 2013
Film Plan
MONDAY
Locations Needed
For mondays shoot I arranged for everyone to bring a different prop so that we had all of the props that we needed on the day, this would meen that we could shoot all of the film that we needed.
WEDNESDAY MORNING
Shot 5 - Lizzie/silhouette/green room with lights (close-up)
Shot 19 - Lizzie/silhouette/green room (extreme close-up)
Location Needed
WEDNESDAY AFTERNOON
Shot 2 - Lizzie (with dog if we can get one)
Shot 8 - Sophie spinning with camera
Shot 10 - Sophie/bridge/rocks
Shot 12 - trees/branches (hand held camera)
Shot 24 - Keira riding her bike
Shot 26 - Sophie/bridge
Locations Needed
Cropton Park (8,10, 12,26)
(Snufmill) Lane (24)
Props Needed
Black beanie hat
Red lipstick (for sophie)
Red skater dress
Fur hood (on a coat)
Bike
White t-shirtFor mondays shoot I arranged for everyone to bring a different prop so that we had all of the props that we needed on the day, this would meen that we could shoot all of the film that we needed.
WEDNESDAY MORNING
Shot 5 - Lizzie/silhouette/green room with lights (close-up)
Shot 6 - Lizzie/smoke (effect found on YouTube layered over)
Shot 14 - Lizzie/silhouette/green room (mid-shot)
Shot 21 - Lizzie/bright lighting/ green room
Location Needed
Green Room (college)
Props
White dress
Lights
Again for this shoot as director of the group I arranged for everyone to bring the different props that we needed and made sure that everyone could make the shoot including our actresses
WEDNESDAY AFTERNOON
Shot 2 - Lizzie (with dog if we can get one)
Shot 3 - Lizzie/trees (in centre)
Shot 4 - Lizzie grabing her skirt (rings on)
Shot 9 - Lizzie spinning with the camera (laughing)
Shot 11 - Lizzie/trees (right hand side)
Shot 17 - Lizzie/gate
Location Needed
Cropton Park
Props
Dog (if we can arrange to get one)
White skater dress
Rings (possible double rings)
Camera with lense
At the end of these three fimling sessions any shots that we still need I will arange for us to get in college times. For the car scenes I have arranged for us to use a teachers car in lesson time. Once we have this car scene fimled I believe we will be able to begin editing our video.
Lyrics
These lyric lists each show different timings and information that we need to know in relation to our 60 second music clip. The show what lyrics are included, and also the different lyrics in each edit, as well as the timings. This will all help us when we begin filming.
Thursday, 13 June 2013
Wednesday, 12 June 2013
Special Effects
Friday, 7 June 2013
Brief
To shoot a 60 second reconstruction of an
existing music video.
Our group chose this video as we through the mise en scene, costume, editing, cinematography and overall video as a whole would be interesting to make. The 60 second clip that we are going to reconstruct is between 1.13 and 2.13. I am the director of our group which means I have to allocate all the members of our group jobs to do, to ensure we make quick progress on the task given.
Subscribe to:
Posts (Atom)